For

Expanding Production

Use the following steps to identify your capacity bottleneck before choosing an upgrade direction.

STEP 01

Diagnose Capacity Bottlenecks Before Expansion Planning

  • Lead Time Pressure

    • Repeated order delay
    • Cutting queue before nesting
    • Bending queue after cutting
    • Setup waiting time
    • Delivery buffer loss

  • Overtime Dependency

    • Multi-shift becomes routine
    • Weekend production becomes normal
    • Setup hours keep extending
    • Output depends on senior operators
    • Quality risk after long shifts

  • Outsourcing Increase

    • External laser cutting orders
    • External press brake bending
    • Outsourced welding or assembly
    • Margin loss from outside processing
    • Lower process control and traceability

  • Scheduling Bottleneck

    • Nesting program queue
    • Bending program queue
    • Tooling changeover waiting
    • Work-in-process transfer delay
    • Final inspection backlog

  • Quality Fluctuation

    • Angle correction increases
    • Backgauge deviation repeats
    • Burr level becomes unstable
    • Hole and contour accuracy drift
    • Rework consumes capacity

  • High Machine Utilization

    • Laser table stays occupied
    • Press brake schedule is saturated
    • No reserve machine hours
    • Maintenance conflicts with orders
    • Urgent orders are hard to insert

STEP 02

Define Upgrade Strategy for Your Factory

  • Existing Machine Potential

    Control & Motion Retrofit

    • Usable machine frame
    • CNC control limitation
    • Backgauge repeatability gap
    • Servo and hydraulic response
    • Tooling interface compatibility

  • Confirmed Output Demand

    Additional Machine Capacity

    • Stable order volume
    • High utilization verified
    • Parallel process routing
    • Peak-order capacity gap
    • Lead time reduction target

  • Aging Equipment Risk

    Aging Equipment Renewal

    • Accuracy loss exceeds adjustment
    • Repair cost keeps rising
    • Downtime affects delivery
    • Safety configuration outdated
    • Long-term reliability requirement

  • Labor and Setup Constraint

    Labor Efficiency Improvement

    • Loading and unloading time
    • Sheet positioning workload
    • Tool setup frequency
    • Offline programming demand
    • Operator workload reduction

  • Quality Stability Requirement

    Accuracy & Quality Stability

    • Repeatability target
    • Bend angle consistency
    • Cut edge quality control
    • Dimensional consistency
    • Batch-to-batch stability

  • New Product Requirement

    New Part Capability

    • Larger sheet format
    • Thicker material range
    • Longer bending length
    • Complex contour cutting
    • Tighter tolerance requirement

Clear capacity planning helps reduce the risk of upgrading the wrong process, adding insufficient capacity, or moving the bottleneck downstream.
STEP 03

Balance Complete Integrated Production Flow

  • Cutting

    Review material grade, thickness range, laser power, table size, nesting efficiency, piercing stability, and cutting takt time.

  • Bending

    Check tonnage margin, bending length, V-die opening, tooling setup, backgauge accuracy, angle control, and batch changeover time.

  • Handling

    Assess sheet loading, finished-part unloading, part sorting, buffer area, lifting method, and work-in-process waiting time.

  • Assembly

    Manufacture, assemble, and inspect the equipment according to confirmed configuration and factory quality-control procedures.

  • Inspection

    Align bend angle inspection, cut profile checks, dimensional measurement, quality records, and sampling frequency with higher output.

  • Delivery

    Coordinate finished-part staging, protective packing, shipment schedule, and customer delivery commitments.

Trusted Global Component Brands

We use internationally recognized components to ensure stable performance, long service life, and reliable operation.
PARTNER

Contact PREF Group

Need a Quick Answer

We highly recommend contacting us via WhatsApp, our engineers are ready to assist you in realtime

Chat on WhatsApp

Send Your Inquiry:

WhatsApp

Leave a message!

Leave a message!